Skip to main content
AG Network Cabling

Healthcare · Abatement & Rehab

ICRA-contained abandoned cable abatement and IDF rehab for healthcare.

CA CSLB #1076251 (C-7 & C-10)One Accountable Team for Power & Low VoltageFree On-Site Survey & Written QuoteVerify Credentials →

At a Glance

Legacy medical buildings often accumulate decades of abandoned low-voltage cabling above ceilings—creating plenum fire-load and fire-barrier compliance issues. AG Network Cabling removes dead cabling per 2025 CEC / NEC rules and rebuilds clinical IDFs under strict ICRA dust control.

HEALTHCARE × ABATEMENT & REHABCA CSLB #1076251 · C-7 & C-10
MDF / ERCORE SWITCHC-10 DEDICATEDOS2 / OM4 RISERFLOOR IDFTIA-606-DPoE++ 802.3btWi-Fi 6E/7 DUAL CAT6AWORKSTATION DROPSCONFERENCE / AV-IPSECURITY / CAMERA PoEMAX 90m PERMANENT LINK (ANSI/TIA-568.2-E)
Field architecture for Abatement & Rehab in Healthcare environments

What Is Different in Healthcare

Tracing and protecting live clinical circuits (nurse call, telemetry, EHR workstations) before any cut is non-negotiable in 24/7 healthcare environments.

Every ceiling tile opened during abatement uses ICRA containment and restores UL-listed firestop seals.

Industry-Specific Scope

  • Live-circuit auditing and tagging prior to abandoned-cable demolition
  • Removal of accessible dead cable per 2023 NEC §722.25, §770.25, and §800.25
  • After-hours clinical IDF closet rehabilitation and TIA-606-D relabeling

Phasing & Site Execution

We work corridor-by-corridor under ICRA permits and schedule closet switch cutovers during approved late-night or weekend windows.

Applicable Codes & Standards

Standard / CodeWhat It Governs
2025 CEC / 2023 NEC §722.25 & §800.25Removal of accessible abandoned cables to reduce plenum fire load
ICRA / FGI GuidelinesDust and pathogen containment during clinical ceiling work

Other Healthcare Scopes

Frequently Asked Questions

How do you guarantee live medical network drops are not disconnected during cable abatement?

We audit active switch ports, tone and tag live cables before cutting, and execute closet cutovers during approved maintenance windows.

CA CSLB #1076251 · C-7 Low Voltage & C-10 Electrical

Ready to scope your project or send plans?

Upload drawings, specifications, or an Invitation to Bid, or call us to schedule a free on-site survey.