Electrical Services (Licensed C-10)
Licensed C-10 power distribution, dedicated IT circuits, panel work, and grounding delivered by the same team installing your low voltage.
At a Glance
AG Network Cabling holds California CSLB License #1076251 for both C-10 Electrical and C-7 Low Voltage Systems. We deliver dedicated IT and server room circuits, rack power and PDUs, electrical panels and sub-panels, tenant-improvement branch circuits, grounding and bonding, and code-compliance corrections—giving general contractors and facility teams one accountable contractor for power and data.
Why Buyers Choose Disciplined Execution
Splitting power and low-voltage work across separate contractors slows down every server room, security closet, and tenant improvement. Low-voltage crews wait on dedicated circuits, electrical crews miss low-voltage pathway clearances, and owners are stuck mediating between two schedules.
With active California C-10 and C-7 classifications under one roof, AG coordinates circuits, grounding, panels, and communications pathways together under the 2025 California Electrical Code.
Scope We Deliver
IT, Server Room & Data Center Power
01- Dedicated 20A/30A/50A branch circuits and locking receptacles for server racks and MDF/IDF closets
- Rack PDU power feeds, UPS circuit integration, and clean panel schedules
- Telecommunications grounding and bonding (TMGB/TGB) per NEC Article 250 and ANSI/TIA-607-E
Commercial Panels & Distribution
02- Electrical panel and sub-panel installations, upgrades, and load balancing
- Commercial tenant-improvement branch circuits, outlets, and workstation power
- Dedicated circuits for access control power supplies, AV racks, and security headends
Code Corrections, Permits & Inspection
03- California Electrical Code (Title 24 Part 3) compliance corrections
- Permit pulling, load calculations coordination, and AHJ inspection walk-throughs
- Safe de-energization, lockout/tagout (LOTO), and NFPA 70E electrical safety practices
How It Works: Survey to Turnover
1. On-Site Survey & Analysis
PHASE 01We walk the facility, inspect existing pathways, closets, and electrical capacity, and clarify schedule or occupancy constraints before pricing.
Site survey notesPathway & closet assessmentWritten scope and quote2. Pre-Construction & Submittals
PHASE 02We prepare product cut sheets, coordinate RFIs with the general contractor or IT lead, and align pathway routing with other trades.
Product submittals & cut sheetsRFI responsesShop drawings / port schedules3. Procurement & Staging
PHASE 03Materials are ordered to specification, staged cleanly, and verified against jobsite delivery windows and security protocols.
Bill of materials verificationDelivery & staging schedule4. Installation & Dressing
PHASE 04Field installation follows NEC, California Electrical Code, and TIA pathway rules with Velcro-dressed bundles and clear trade separation.
Daily progress logsIn-progress quality checks5. Testing & Commissioning
PHASE 05Every drop, fiber strand, circuit, or device is verified against applicable TIA, IEEE, or NFPA performance limits before turnover.
Certification test reportsCommissioning & punchlist sign-off6. Documentation & Closeout
PHASE 06We label infrastructure to ANSI/TIA-606-D conventions and hand over complete digital closeout packages for your facilities and IT teams.
TIA-606 labeling scheduleRedline as-builtsO&M manuals & owner training7. Ongoing Support
PHASE 07Post-turnover moves, adds, changes (MACs), troubleshooting, and preventive maintenance keep systems documented as your facility evolves.
Updated port mapsService tickets & maintenance records
Applicable Standards & Codes
| Standard / Code | What It Governs |
|---|---|
| 2025 California Electrical Code (Title 24 Part 3) | Adopted California electrical wiring, panels, grounding, and circuit requirements (based on 2023 NEC) |
| NFPA 70 (2023 NEC) | Art. 250 (grounding/bonding), Art. 645 (IT equipment), Art. 722/725 (Class 2/3 separation) |
| NFPA 70E (2024) | Electrical safety in the workplace, arc-flash PPE, and LOTO procedures |
| Cal/OSHA Title 8 | California jobsite electrical safety orders |
Deliverables at Turnover
- Updated, typed panel circuit directories and circuit-to-rack labeling
- Permit sign-off and AHJ inspection cards where permits apply
- Grounding/bonding continuity verification and as-built circuit markups
Testing & Verification
All circuits undergo polarity, voltage, ground-continuity, and load verification prior to energization and equipment handoff.
Warranty & Licensing
Workmanship warranty terms are specified in your written proposal; all work is executed under active California C-10 License #1076251.
Applicable License: California CSLB #1076251 (C-10 Electrical)
How This Scope Adapts by Industry
Rack power circuits, PDU feeds, NEC Article 645 compliance, and EOR coordination.
Why AG Network Cabling
Related Services
Data Center Cabling
High-density copper and MPO/MTP fiber infrastructure, overhead pathways, cabinets, and rack power coordination for white-space data halls and enterprise server rooms.
Structured Cabling
Commercial Cat6, Cat6A, Cat7/Cat8 copper, backbone fiber, wireless access point drops, and tidy MDF/IDF closets installed and tested drop-by-drop.
Access Control
Card and mobile-credential readers, controllers, electrified strikes and maglocks, gate entry, fire-alarm egress integration, and clean panel installation.
Prevailing Wage & Public Works
Public-sector low-voltage (C-7) and electrical (C-10) contracting supporting California prevailing wage, certified payroll documentation, and federal Davis-Bacon projects.
Frequently Asked Questions
Does AG Network Cabling hold an active California C-10 Electrical license?
Yes. AG Network Cabling Inc holds active California CSLB License #1076251 with both C-10 (Electrical) and C-7 (Low Voltage Systems) classifications, verifiable directly on the CSLB website.
Why hire one contractor for both C-10 electrical and C-7 low voltage?
Server rooms, access control panels, AV racks, and security headends all require dedicated power alongside data cabling. One contractor eliminates scheduling gaps, duplicate mobilization, and finger-pointing between trades.
Do you handle permits and city inspections for commercial electrical work?
Yes. When a scope requires electrical permits and Authority Having Jurisdiction (AHJ) inspection, we coordinate permit submission, inspection scheduling, and final sign-off.
Can you install dedicated circuits for our server racks and UPS units?
Yes. We install dedicated circuits, locking receptacles, sub-panels, and grounding/bonding busbars sized to your UPS and rack PDU specifications.
Do you perform Title 24 lighting controls or EV charging?
Dedicated C-10 electrical distribution is a core service. Specialized scopes requiring EVITP or CALCTP acceptance-testing credentials are reviewed during your site survey to confirm exact requirements.
CA CSLB #1076251 · C-7 Low Voltage & C-10 Electrical
Ready to scope your project or send plans?
Upload drawings, specifications, or an Invitation to Bid, or call us to schedule a free on-site survey.