Skip to main content
AG Network Cabling
Electrical (C-10)

Electrical Services (Licensed C-10)

Licensed C-10 power distribution, dedicated IT circuits, panel work, and grounding delivered by the same team installing your low voltage.

CA CSLB #1076251 (C-7 & C-10)One Accountable Team for Power & Low VoltageFree On-Site Survey & Written QuoteVerify Credentials →

At a Glance

AG Network Cabling holds California CSLB License #1076251 for both C-10 Electrical and C-7 Low Voltage Systems. We deliver dedicated IT and server room circuits, rack power and PDUs, electrical panels and sub-panels, tenant-improvement branch circuits, grounding and bonding, and code-compliance corrections—giving general contractors and facility teams one accountable contractor for power and data.

ELECTRICAL (C-10) · SYSTEM ARCHITECTURECA CSLB #1076251 · C-7 & C-10
C-10 SUB-PANEL20A/30A LOCKING RACK PDUs (A/B)DEDICATED UPS & SECURITY CIRCUITSNEC ART. 250 / TIA-607-E TMGB BUSBAR2025 CALIFORNIA ELECTRICAL CODE (TITLE 24 PART 3) · NFPA 70E LOTO SAFETY
Typical AG Network Cabling topology for Electrical Services (Licensed C-10) (2025 California Electrical Code (Title 24 Part 3))

Why Buyers Choose Disciplined Execution

Splitting power and low-voltage work across separate contractors slows down every server room, security closet, and tenant improvement. Low-voltage crews wait on dedicated circuits, electrical crews miss low-voltage pathway clearances, and owners are stuck mediating between two schedules.

With active California C-10 and C-7 classifications under one roof, AG coordinates circuits, grounding, panels, and communications pathways together under the 2025 California Electrical Code.

Scope We Deliver

IT, Server Room & Data Center Power

01
  • Dedicated 20A/30A/50A branch circuits and locking receptacles for server racks and MDF/IDF closets
  • Rack PDU power feeds, UPS circuit integration, and clean panel schedules
  • Telecommunications grounding and bonding (TMGB/TGB) per NEC Article 250 and ANSI/TIA-607-E

Commercial Panels & Distribution

02
  • Electrical panel and sub-panel installations, upgrades, and load balancing
  • Commercial tenant-improvement branch circuits, outlets, and workstation power
  • Dedicated circuits for access control power supplies, AV racks, and security headends

Code Corrections, Permits & Inspection

03
  • California Electrical Code (Title 24 Part 3) compliance corrections
  • Permit pulling, load calculations coordination, and AHJ inspection walk-throughs
  • Safe de-energization, lockout/tagout (LOTO), and NFPA 70E electrical safety practices

How It Works: Survey to Turnover

  1. 1. On-Site Survey & Analysis

    PHASE 01

    We walk the facility, inspect existing pathways, closets, and electrical capacity, and clarify schedule or occupancy constraints before pricing.

    Site survey notesPathway & closet assessmentWritten scope and quote
  2. 2. Pre-Construction & Submittals

    PHASE 02

    We prepare product cut sheets, coordinate RFIs with the general contractor or IT lead, and align pathway routing with other trades.

    Product submittals & cut sheetsRFI responsesShop drawings / port schedules
  3. 3. Procurement & Staging

    PHASE 03

    Materials are ordered to specification, staged cleanly, and verified against jobsite delivery windows and security protocols.

    Bill of materials verificationDelivery & staging schedule
  4. 4. Installation & Dressing

    PHASE 04

    Field installation follows NEC, California Electrical Code, and TIA pathway rules with Velcro-dressed bundles and clear trade separation.

    Daily progress logsIn-progress quality checks
  5. 5. Testing & Commissioning

    PHASE 05

    Every drop, fiber strand, circuit, or device is verified against applicable TIA, IEEE, or NFPA performance limits before turnover.

    Certification test reportsCommissioning & punchlist sign-off
  6. 6. Documentation & Closeout

    PHASE 06

    We label infrastructure to ANSI/TIA-606-D conventions and hand over complete digital closeout packages for your facilities and IT teams.

    TIA-606 labeling scheduleRedline as-builtsO&M manuals & owner training
  7. 7. Ongoing Support

    PHASE 07

    Post-turnover moves, adds, changes (MACs), troubleshooting, and preventive maintenance keep systems documented as your facility evolves.

    Updated port mapsService tickets & maintenance records

Applicable Standards & Codes

Standard / CodeWhat It Governs
2025 California Electrical Code (Title 24 Part 3)Adopted California electrical wiring, panels, grounding, and circuit requirements (based on 2023 NEC)
NFPA 70 (2023 NEC)Art. 250 (grounding/bonding), Art. 645 (IT equipment), Art. 722/725 (Class 2/3 separation)
NFPA 70E (2024)Electrical safety in the workplace, arc-flash PPE, and LOTO procedures
Cal/OSHA Title 8California jobsite electrical safety orders

Deliverables at Turnover

  • Updated, typed panel circuit directories and circuit-to-rack labeling
  • Permit sign-off and AHJ inspection cards where permits apply
  • Grounding/bonding continuity verification and as-built circuit markups

Testing & Verification

All circuits undergo polarity, voltage, ground-continuity, and load verification prior to energization and equipment handoff.

Warranty & Licensing

Workmanship warranty terms are specified in your written proposal; all work is executed under active California C-10 License #1076251.

Applicable License: California CSLB #1076251 (C-10 Electrical)

How This Scope Adapts by Industry

Rack power circuits, PDU feeds, NEC Article 645 compliance, and EOR coordination.

Why AG Network Cabling

Single accountable contractor for C-7 low voltage and C-10 electrical.
Clean, Velcro-dressed, ANSI/TIA-606-D labeled infrastructure.
Discreet execution in occupied offices, luxury hotels, clinics, and data halls.
Direct access to accountable owners and a free on-site survey before work begins.

Related Services

Frequently Asked Questions

Does AG Network Cabling hold an active California C-10 Electrical license?

Yes. AG Network Cabling Inc holds active California CSLB License #1076251 with both C-10 (Electrical) and C-7 (Low Voltage Systems) classifications, verifiable directly on the CSLB website.

Why hire one contractor for both C-10 electrical and C-7 low voltage?

Server rooms, access control panels, AV racks, and security headends all require dedicated power alongside data cabling. One contractor eliminates scheduling gaps, duplicate mobilization, and finger-pointing between trades.

Do you handle permits and city inspections for commercial electrical work?

Yes. When a scope requires electrical permits and Authority Having Jurisdiction (AHJ) inspection, we coordinate permit submission, inspection scheduling, and final sign-off.

Can you install dedicated circuits for our server racks and UPS units?

Yes. We install dedicated circuits, locking receptacles, sub-panels, and grounding/bonding busbars sized to your UPS and rack PDU specifications.

Do you perform Title 24 lighting controls or EV charging?

Dedicated C-10 electrical distribution is a core service. Specialized scopes requiring EVITP or CALCTP acceptance-testing credentials are reviewed during your site survey to confirm exact requirements.

CA CSLB #1076251 · C-7 Low Voltage & C-10 Electrical

Ready to scope your project or send plans?

Upload drawings, specifications, or an Invitation to Bid, or call us to schedule a free on-site survey.