Skip to main content
AG Network Cabling
Network & Data Center

Structured Cabling Installation

Clean, TIA-568.2-E compliant horizontal and backbone cabling dressed with precision and tested drop-by-drop.

CA CSLB #1076251 (C-7 & C-10)One Accountable Team for Power & Low VoltageFree On-Site Survey & Written QuoteVerify Credentials →

At a Glance

AG Network Cabling designs, installs, labels, and tests commercial structured cabling systems across Los Angeles, Orange, Riverside, and San Bernardino counties, statewide California, and multi-site programs. Licensed under CSLB #1076251 (C-7 and C-10), we deliver Cat6/Cat6A horizontal drops, riser/plenum backbones, WAP cabling, and organized telecom closets with a free on-site survey and written quote.

NETWORK & DATA CENTER · SYSTEM ARCHITECTURECA CSLB #1076251 · C-7 & C-10
MDF / ERCORE SWITCHC-10 DEDICATEDOS2 / OM4 RISERFLOOR IDFTIA-606-DPoE++ 802.3btWi-Fi 6E/7 DUAL CAT6AWORKSTATION DROPSCONFERENCE / AV-IPSECURITY / CAMERA PoEMAX 90m PERMANENT LINK (ANSI/TIA-568.2-E)
Typical AG Network Cabling topology for Structured Cabling Installation (ANSI/TIA-568.2-E)

Why Buyers Choose Disciplined Execution

Poorly supported horizontal cable, mixed plenum and riser jackets, and unlabelled patch panels create intermittent network failures and slow down every future IT move or expansion. In high-power PoE environments supporting Wi-Fi 6E/7 access points and cameras, tight zip-tied bundles also cause heat rise and signal degradation.

General contractors and IT directors need a low-voltage partner who hits move-in deadlines, keeps ceilings and closets neat enough to photograph, and hands over verified test reports on day one.

Scope We Deliver

Horizontal & Workstation Cabling

01
  • Cat5e, Cat6, Cat6A, Cat7, and Cat8 balanced twisted-pair data drops
  • Cat3 voice tie cables and coaxial distribution runs where required
  • Plenum (CMP) and riser (CMR) jacket selection verified to building air-handling spaces
  • IEEE 802.3bt PoE++ bundle-heating and DCRU awareness per ANSI/TIA-568.2-E Annex H

Wireless, Backbone & Closets

02
  • Ceiling and wall wireless access point (WAP) dual-drop cabling and mounting
  • Copper and optical fiber riser backbones linking MDF and IDF telecom rooms
  • Patch panel termination, modular jack faceplates, and Velcro-dressed cable looms
  • J-hooks, cable tray, ladder rack, conduit sleeves, and UL-listed firestopping

Lifecycle & MAC Support

03
  • Moves, adds, and changes (MACs) for growing commercial offices and campuses
  • Server cabinet and telecom closet reorganizations
  • Drop-by-drop testing, port mapping, and TIA-606-D labeling

How It Works: Survey to Turnover

  1. 1. On-Site Survey & Analysis

    PHASE 01

    We walk the facility, inspect existing pathways, closets, and electrical capacity, and clarify schedule or occupancy constraints before pricing.

    Site survey notesPathway & closet assessmentWritten scope and quote
  2. 2. Pre-Construction & Submittals

    PHASE 02

    We prepare product cut sheets, coordinate RFIs with the general contractor or IT lead, and align pathway routing with other trades.

    Product submittals & cut sheetsRFI responsesShop drawings / port schedules
  3. 3. Procurement & Staging

    PHASE 03

    Materials are ordered to specification, staged cleanly, and verified against jobsite delivery windows and security protocols.

    Bill of materials verificationDelivery & staging schedule
  4. 4. Installation & Dressing

    PHASE 04

    Field installation follows NEC, California Electrical Code, and TIA pathway rules with Velcro-dressed bundles and clear trade separation.

    Daily progress logsIn-progress quality checks
  5. 5. Testing & Commissioning

    PHASE 05

    Every drop, fiber strand, circuit, or device is verified against applicable TIA, IEEE, or NFPA performance limits before turnover.

    Certification test reportsCommissioning & punchlist sign-off
  6. 6. Documentation & Closeout

    PHASE 06

    We label infrastructure to ANSI/TIA-606-D conventions and hand over complete digital closeout packages for your facilities and IT teams.

    TIA-606 labeling scheduleRedline as-builtsO&M manuals & owner training
  7. 7. Ongoing Support

    PHASE 07

    Post-turnover moves, adds, changes (MACs), troubleshooting, and preventive maintenance keep systems documented as your facility evolves.

    Updated port mapsService tickets & maintenance records

Applicable Standards & Codes

Standard / CodeWhat It Governs
ANSI/TIA-568.2-EBalanced twisted-pair cabling (Cat5e/6/6A/8), DCRU, and Annex H PoE bundle guidance
ANSI/TIA-568.1-ECommercial building telecommunications cabling architecture (ER/TR/horizontal)
ANSI/TIA-569-ETelecommunications pathways and spaces (J-hooks, tray, conduit, MDF/IDF)
ANSI/TIA-606-DLabeling, color coding, and administration records
ANSI/TIA-607-ETelecommunications bonding and grounding in MDF/IDF rooms
2025 CEC (Title 24 Part 3)NEC 2023-based California wiring methods, Art. 722 and Art. 800 compliance

Deliverables at Turnover

  • Drop-by-drop copper certification test results exported in PDF and native formats
  • ANSI/TIA-606-D labels at every faceplate, patch panel port, and cable end
  • Marked floor plans showing drop locations and ID numbers
  • Clean, vacuumed MDF/IDF closets ready for switch patching

Testing & Verification

Every horizontal and backbone copper run is tested drop-by-drop for wiremap, length, insertion loss, NEXT, return loss, and PoE readiness against ANSI/TIA-568.2-E limits.

Warranty & Licensing

Workmanship warranty terms and eligible manufacturer system warranties are detailed in your written quote before work starts.

Applicable License: California CSLB #1076251 (C-7)

How This Scope Adapts by Industry

Fast-track tenant improvements, workstation drops, conference room infrastructure, and WAP cabling.

Why AG Network Cabling

Single accountable contractor for C-7 low voltage and C-10 electrical.
Clean, Velcro-dressed, ANSI/TIA-606-D labeled infrastructure.
Discreet execution in occupied offices, luxury hotels, clinics, and data halls.
Direct access to accountable owners and a free on-site survey before work begins.

Related Services

Frequently Asked Questions

Should we install Cat6 or Cat6A for a new commercial office buildout?

Cat6A is recommended for new commercial builds, wireless access points, AV-over-IP, and high-power PoE (IEEE 802.3bt) because it supports 10GBASE-T to 100 meters and handles bundle heating better under ANSI/TIA-568.2-E. Cat6 remains practical for budget-constrained standard 1G workstation drops.

How do you prevent messy telecom closets?

We dress bundles with hook-and-loop Velcro (never over-tightened zip ties), route cables cleanly into horizontal and vertical managers, and label every termination to ANSI/TIA-606-D standards before testing.

Do you handle plenum-rated cabling and firestopping?

Yes. We verify air-handling ceiling spaces during the site survey, pull CMP plenum-rated cable where required by the California Electrical Code, and seal rated wall and floor penetrations using UL-listed firestop systems.

Can you install dedicated electrical circuits in our MDF/IDF at the same time?

Yes. Because AG holds both C-7 (Low Voltage) and C-10 (Electrical) licenses under CSLB #1076251, we can install dedicated 20A/30A circuits, rack PDUs, and grounding busbars alongside the cabling.

How quickly can we get a site survey and quote?

We provide a free on-site survey and a written quote detailing scope, timeline, and cost before work begins. Contact us or upload your floor plans on our Request a Quote page.

CA CSLB #1076251 · C-7 Low Voltage & C-10 Electrical

Ready to scope your project or send plans?

Upload drawings, specifications, or an Invitation to Bid, or call us to schedule a free on-site survey.