Skip to main content
AG Network Cabling
Network & Data Center

Fiber Optic Cabling & Splicing

OS2 and OM3/OM4/OM5 fiber backbones, precision fusion splicing, enclosures, and documented optical testing.

CA CSLB #1076251 (C-7 & C-10)One Accountable Team for Power & Low VoltageFree On-Site Survey & Written QuoteVerify Credentials →

At a Glance

AG Network Cabling installs, fusion-splices, terminates, tests, and repairs optical fiber networks for data centers, multi-building campuses, hospitals, schools, and commercial buildings. Licensed in California under CSLB #1076251 (C-7 and C-10), we deliver OS2 single-mode and OM3/OM4/OM5 multimode backbones with full splice documentation and Tier 1/Tier 2 testing.

NETWORK & DATA CENTER · SYSTEM ARCHITECTURECA CSLB #1076251 · C-7 & C-10
CORE-ALIGNMENT FUSION SPLICING · TIER 1 OLTS & TIER 2 OTDR TRACESPLICE LOSS < 0.05 dB TYPICAL0m LAUNCHSPLICE EVENT VERIFIEDPASS · TIA-526-7 / 526-14
Typical AG Network Cabling topology for Fiber Optic Cabling & Splicing (ANSI/TIA-568.3-E)

Why Buyers Choose Disciplined Execution

A single high-loss splice, dirty end-face, or pinched innerduct bend can cripple a 10G/40G/100G campus or data center backbone. Fiber installations require disciplined bend-radius control, clean fusion splicing, and verifiable optical loss documentation rather than guesswork.

When an active backbone is damaged during renovation or trenching, every hour of outage costs operations. Buyers need a contractor equipped for both planned high-strand buildouts and rapid fiber restoration.

Scope We Deliver

Fiber Cable & Backbone Installation

01
  • Single-mode (OS2) and laser-optimized multimode (OM3, OM4, OM5) fiber pulls
  • Armored (AIA), plenum/riser, and indoor/outdoor rated campus backbone cables
  • Innerduct, fiber raceway, and conduit pathway installation
  • Pre-terminated MPO/MTP trunks and field-terminated bulk fiber

Splicing, Termination & Enclosures

02
  • Core-alignment fusion splicing (pigtail splicing and mid-span/butt splices)
  • Mechanical termination where specified for rapid field restoration
  • Rack-mount and wall-mount fiber distribution panels, cassettes, and splice trays
  • LC, SC, ST, and MPO/MTP connector polishing, inspection, and cleaning

Testing & Emergency Repair

03
  • Tier 1 Optical Loss Test Set (OLTS) bidirectional attenuation testing
  • Tier 2 OTDR trace characterization to verify splice and connector event losses
  • Emergency fiber cut troubleshooting, re-splicing, and link restoration
  • Complete splice maps and fiber strand assignment schedules

How It Works: Survey to Turnover

  1. 1. On-Site Survey & Analysis

    PHASE 01

    We walk the facility, inspect existing pathways, closets, and electrical capacity, and clarify schedule or occupancy constraints before pricing.

    Site survey notesPathway & closet assessmentWritten scope and quote
  2. 2. Pre-Construction & Submittals

    PHASE 02

    We prepare product cut sheets, coordinate RFIs with the general contractor or IT lead, and align pathway routing with other trades.

    Product submittals & cut sheetsRFI responsesShop drawings / port schedules
  3. 3. Procurement & Staging

    PHASE 03

    Materials are ordered to specification, staged cleanly, and verified against jobsite delivery windows and security protocols.

    Bill of materials verificationDelivery & staging schedule
  4. 4. Installation & Dressing

    PHASE 04

    Field installation follows NEC, California Electrical Code, and TIA pathway rules with Velcro-dressed bundles and clear trade separation.

    Daily progress logsIn-progress quality checks
  5. 5. Testing & Commissioning

    PHASE 05

    Every drop, fiber strand, circuit, or device is verified against applicable TIA, IEEE, or NFPA performance limits before turnover.

    Certification test reportsCommissioning & punchlist sign-off
  6. 6. Documentation & Closeout

    PHASE 06

    We label infrastructure to ANSI/TIA-606-D conventions and hand over complete digital closeout packages for your facilities and IT teams.

    TIA-606 labeling scheduleRedline as-builtsO&M manuals & owner training
  7. 7. Ongoing Support

    PHASE 07

    Post-turnover moves, adds, changes (MACs), troubleshooting, and preventive maintenance keep systems documented as your facility evolves.

    Updated port mapsService tickets & maintenance records

Applicable Standards & Codes

Standard / CodeWhat It Governs
ANSI/TIA-568.3-EOptical fiber cabling and component transmission performance
ANSI/TIA-758-CCustomer-owned outside plant (OSP) campus fiber backbones
TIA-526-14 / IEC 61280-4-1Multimode fiber OLTS testing and Encircled Flux launch conditions
TIA-526-7 / IEC 61280-4-2Single-mode fiber optical power loss measurement
2025 CEC / NEC Art. 770Optical fiber cable listing, grounding of conductive armor, and Art. 770.25 abandoned fiber

Deliverables at Turnover

  • Bidirectional Tier 1 OLTS attenuation reports and Tier 2 OTDR traces (where specified)
  • Fiber splice tray maps and port-to-port strand schedules
  • Labeled fiber enclosures and armored cable tags per ANSI/TIA-606-D
  • End-face inspection sign-off and as-built routing diagrams

Testing & Verification

All fiber links are cleaned, inspected, and tested for optical loss and polarity against ANSI/TIA-568.3-E and TIA-526-7/526-14 budgets.

Warranty & Licensing

Workmanship warranty and eligible manufacturer optical warranties are confirmed in writing within your project proposal.

Applicable License: California CSLB #1076251 (C-7)

How This Scope Adapts by Industry

High-count OS2 and OM4/OM5 MPO trunks, splice trays, and rapid testing throughput for white-space turnover.

Why AG Network Cabling

Single accountable contractor for C-7 low voltage and C-10 electrical.
Clean, Velcro-dressed, ANSI/TIA-606-D labeled infrastructure.
Discreet execution in occupied offices, luxury hotels, clinics, and data halls.
Direct access to accountable owners and a free on-site survey before work begins.

Related Services

Frequently Asked Questions

When should we choose fusion splicing over mechanical fiber termination?

Fusion splicing produces lower insertion loss, better return loss, and higher long-term mechanical reliability—making it the preferred method for data center backbones, campus risers, and high-speed 10G–400G links.

What is the difference between Tier 1 (OLTS) and Tier 2 (OTDR) fiber testing?

Tier 1 OLTS measures total end-to-end optical power loss, length, and polarity against the TIA loss budget. Tier 2 adds an OTDR trace that pinpoints the exact loss and distance of every splice, connector, and bend along the link.

Do you install indoor/outdoor and armored fiber between buildings?

Yes. We pull indoor/outdoor rated and interlocked armored (AIA) OS2 single-mode and OM4 multimode cables through campus conduit pathways per ANSI/TIA-758-C and NEC Article 770.

Can you repair a severed fiber backbone quickly?

Yes. We perform emergency fiber troubleshooting, fault location, re-splicing, enclosure restoration, and post-repair verification. Call our main line directly for urgent outages.

Do you provide splice documentation at closeout?

Yes. Every fiber buildout closes with labeled enclosures, strand-by-strand splice maps, and complete optical test reports.

CA CSLB #1076251 · C-7 Low Voltage & C-10 Electrical

Ready to scope your project or send plans?

Upload drawings, specifications, or an Invitation to Bid, or call us to schedule a free on-site survey.