Security Cabling
Purpose-built composite, PoE, and low-voltage power cabling for doors, cameras, gates, and security headends.
At a Glance
AG Network Cabling installs structured security cabling for video surveillance, access control, intercoms, perimeter gates, and intrusion devices across commercial, industrial, and public-sector facilities. Under California CSLB #1076251 (C-7 and C-10), we deliver composite access-control cables, PoE camera drops, 12V/24V power runs, and neat panel handoffs either for our own systems team or third-party security integrators.
Why Buyers Choose Disciplined Execution
Security systems fail when cabling is pulled hastily without separating power from data, leaving unlabelled wire loops at door frames or overloaded power supplies. Security integrators and GCs need clean physical-layer cabling pulled on schedule, labeled clearly at both ends, and ready for immediate device trim-out.
Scope We Deliver
Access Control & Door Cabling
01- Composite access-control cable (reader, lock power, REX, door position switch) to every opening
- Concealed door-frame routing, transfer hinges, and fire-alarm release tie-in wiring
- Clean homerun dressing into security control panels and power enclosures
Video, Intercom & Perimeter Cabling
02- Plenum, riser, and outdoor/direct-burial shielded Cat6/Cat6A PoE camera drops
- Fiber backhaul for distant perimeter poles, parking structures, and guard shacks
- Intercom, video door phone, vehicle gate loop, and barrier control cabling
- Low-voltage 12V/24V power runs and dedicated C-10 headend power circuits
Integrator Handoff & Documentation
03- Continuity, certification, and PoE load testing before device trim-out
- Door-number and camera-ID labeling matched to architectural security drawings
- Clean handoff to AG's security installation team or owner-furnished integrators
How It Works: Survey to Turnover
1. On-Site Survey & Analysis
PHASE 01We walk the facility, inspect existing pathways, closets, and electrical capacity, and clarify schedule or occupancy constraints before pricing.
Site survey notesPathway & closet assessmentWritten scope and quote2. Pre-Construction & Submittals
PHASE 02We prepare product cut sheets, coordinate RFIs with the general contractor or IT lead, and align pathway routing with other trades.
Product submittals & cut sheetsRFI responsesShop drawings / port schedules3. Procurement & Staging
PHASE 03Materials are ordered to specification, staged cleanly, and verified against jobsite delivery windows and security protocols.
Bill of materials verificationDelivery & staging schedule4. Installation & Dressing
PHASE 04Field installation follows NEC, California Electrical Code, and TIA pathway rules with Velcro-dressed bundles and clear trade separation.
Daily progress logsIn-progress quality checks5. Testing & Commissioning
PHASE 05Every drop, fiber strand, circuit, or device is verified against applicable TIA, IEEE, or NFPA performance limits before turnover.
Certification test reportsCommissioning & punchlist sign-off6. Documentation & Closeout
PHASE 06We label infrastructure to ANSI/TIA-606-D conventions and hand over complete digital closeout packages for your facilities and IT teams.
TIA-606 labeling scheduleRedline as-builtsO&M manuals & owner training7. Ongoing Support
PHASE 07Post-turnover moves, adds, changes (MACs), troubleshooting, and preventive maintenance keep systems documented as your facility evolves.
Updated port mapsService tickets & maintenance records
Applicable Standards & Codes
| Standard / Code | What It Governs |
|---|---|
| 2025 CEC / NEC Art. 722 & 725 | Class 2 and Class 3 power-limited security cabling, separation from line voltage, and Art. 722.25 |
| ANSI/TIA-568.2-E | Cat6/Cat6A PoE cabling for IP cameras and network door controllers |
| ANSI/TIA-606-D | Consistent door, camera, and security panel identification |
| UL 294 | Electrical and pathway requirements for access control system units |
Deliverables at Turnover
- Labeled security homeruns dressed cleanly into enclosures with service loops
- Test reports for all Cat6/Cat6A PoE drops and continuity verification for composite cables
- As-built security floor plans with verified camera and door IDs
Testing & Verification
IP camera drops are certified to TIA-568.2-E; composite door and sensor cables are continuity- and resistance-tested before panel landing.
Warranty & Licensing
Workmanship warranty terms are included in your written quote; outdoor and conduit pathways are weather-sealed to code.
Applicable License: California CSLB #1076251 (C-7 & C-10)
How This Scope Adapts by Industry
High-security cage, mantrap, and perimeter camera/access pathways with strict conduit separation.
Why AG Network Cabling
Related Services
Access Control
Card and mobile-credential readers, controllers, electrified strikes and maglocks, gate entry, fire-alarm egress integration, and clean panel installation.
Video Surveillance
Commercial IP video surveillance, dome/bullet/PTZ/megapixel cameras, NVR/VMS deployment, retention sizing, NDAA §889 compliant sourcing, and cybersecurity hardening.
Structured Cabling
Commercial Cat6, Cat6A, Cat7/Cat8 copper, backbone fiber, wireless access point drops, and tidy MDF/IDF closets installed and tested drop-by-drop.
Electrical (C-10)
Licensed California C-10 commercial and IT-adjacent electrical work: dedicated server circuits, rack PDUs, panels, sub-panels, TI power, grounding, and code corrections.
Frequently Asked Questions
Can AG Network Cabling pull security cabling for our national security integrator?
Yes. We routinely partner with general contractors and enterprise security integrators to install, label, and test all security cabling and conduits so their commissioning techs arrive to a clean, ready headend.
What cable types do you use for access-controlled doors?
We install UL-listed composite access control cable (typically bundling shielded reader wire, 18/2 or 18/4 lock power, REX, and door contact conductors) or discrete plenum/riser cables matching the hardware schedule.
Do you handle outdoor conduit and lightning/surge protection for exterior cameras?
Yes. We pull outdoor-rated shielded Cat6A or fiber in EMT/rigid conduit, seal exterior penetrations, and coordinate surge protection and grounding per NEC requirements.
Does intrusion alarm monitoring require a separate California license?
Yes. Operating an alarm company (intrusion alarm sales/monitoring and certain access scopes) in California requires a BSIS Alarm Company Operator (ACO) license. We verify exact licensing boundaries before scoping any intrusion system.
Can you provide the 120V power for security enclosures too?
Yes. Our C-10 Electrical license allows us to bring dedicated 120V circuits directly to security power supply enclosures and NVR racks.
CA CSLB #1076251 · C-7 Low Voltage & C-10 Electrical
Ready to scope your project or send plans?
Upload drawings, specifications, or an Invitation to Bid, or call us to schedule a free on-site survey.