Skip to main content
AG Network Cabling
Security & Life Safety

Fire Alarm Systems & Integration

Code-disciplined fire alarm wiring, device installation, and integrated life-safety interfaces built to pass AHJ inspection.

CA CSLB #1076251 (C-7 & C-10)One Accountable Team for Power & Low VoltageFree On-Site Survey & Written QuoteVerify Credentials →

At a Glance

AG Network Cabling supports commercial fire alarm installation and life-safety integration under California CSLB #1076251 (C-10 Electrical and C-7 Low Voltage). We coordinate engineered drawings, install fire-rated pathways and initiating/notification devices, wire access-control door release, elevator recall, and HVAC shutdown relays, and support AHJ acceptance testing to NFPA 72 and the 2025 California Fire Code.

SECURITY & LIFE SAFETY · SYSTEM ARCHITECTURECA CSLB #1076251 · C-7 & C-10
FACU (UL 864)CSFM LISTED · NFPA 72NEC ART. 760 FPLP/FPLRC-10 PRIMARY POWERINITIATING LOOP (SMOKE / HEAT / PULL)NAC HORNS / STROBES / VOICE EVACNFPA 4 RELAYS: ACCESS RELEASE · ELEVATOR · HVACAHJ / HCAI / DSA ACCEPTANCE PRE-TEST
Typical AG Network Cabling topology for Fire Alarm Systems & Integration (NFPA 72 (2025))

Why Buyers Choose Disciplined Execution

Fire alarm delays hold up certificates of occupancy faster than almost any other trade. Missed relay interfaces to maglocks, elevator controllers, or smoke dampers force failed Authority Having Jurisdiction (AHJ) pre-tests and costly rework.

We coordinate closely with fire protection engineers, NICET-certified designers, and local fire marshals so pathways, CSFM-listed hardware, and integrated system triggers work together cleanly on test day.

Scope We Deliver

Fire Alarm Installation & Pathways

01
  • Fire-alarm power-limited (FPLP/FPLR) and pathway-survivability conduit installations per NEC Article 760
  • Addressable fire alarm control units (UL 864 / CSFM-listed), smoke/heat detectors, pull stations, and horn/strobes
  • Dedicated 120V primary power circuits installed under our C-10 license

Integrated Life-Safety Interfaces

02
  • Access control fail-safe door release and delayed-egress integration
  • Elevator Phase I recall and shunt-trip coordination
  • HVAC fan shutdown, smoke damper, and fire-sprinkler flow/tamper monitoring tie-ins

Plan Check & Acceptance Testing Support

03
  • Design coordination with licensed fire protection engineers or NICET-certified designers
  • 100% pre-testing of initiating devices, notification circuits, and supervisory signals
  • Support for AHJ final acceptance testing and NFPA 4 integrated system testing

How It Works: Survey to Turnover

  1. 1. On-Site Survey & Analysis

    PHASE 01

    We walk the facility, inspect existing pathways, closets, and electrical capacity, and clarify schedule or occupancy constraints before pricing.

    Site survey notesPathway & closet assessmentWritten scope and quote
  2. 2. Pre-Construction & Submittals

    PHASE 02

    We prepare product cut sheets, coordinate RFIs with the general contractor or IT lead, and align pathway routing with other trades.

    Product submittals & cut sheetsRFI responsesShop drawings / port schedules
  3. 3. Procurement & Staging

    PHASE 03

    Materials are ordered to specification, staged cleanly, and verified against jobsite delivery windows and security protocols.

    Bill of materials verificationDelivery & staging schedule
  4. 4. Installation & Dressing

    PHASE 04

    Field installation follows NEC, California Electrical Code, and TIA pathway rules with Velcro-dressed bundles and clear trade separation.

    Daily progress logsIn-progress quality checks
  5. 5. Testing & Commissioning

    PHASE 05

    Every drop, fiber strand, circuit, or device is verified against applicable TIA, IEEE, or NFPA performance limits before turnover.

    Certification test reportsCommissioning & punchlist sign-off
  6. 6. Documentation & Closeout

    PHASE 06

    We label infrastructure to ANSI/TIA-606-D conventions and hand over complete digital closeout packages for your facilities and IT teams.

    TIA-606 labeling scheduleRedline as-builtsO&M manuals & owner training
  7. 7. Ongoing Support

    PHASE 07

    Post-turnover moves, adds, changes (MACs), troubleshooting, and preventive maintenance keep systems documented as your facility evolves.

    Updated port mapsService tickets & maintenance records

Applicable Standards & Codes

Standard / CodeWhat It Governs
NFPA 72 (2025)National Fire Alarm and Signaling Code (installation, testing, survivability, Ch. 11 cybersecurity)
2025 California Fire Code (Title 24 Part 9)State fire-alarm, occupancy, and AHJ acceptance requirements
2025 CEC / NEC Art. 760Fire alarm circuit wiring methods, power-limited separation, and Art. 760.25
UL 864 & CSFM BMLListed fire alarm control units and California State Fire Marshal equipment listing
NFPA 3 & NFPA 4 (2024)Commissioning and integrated testing of interconnected fire/life-safety systems

Deliverables at Turnover

  • As-built device address maps and riser diagrams
  • NFPA 72 Record of Completion documentation coordinated with the designer/engineer of record
  • Pre-test sign-off checklist prior to AHJ witness testing

Testing & Verification

Every initiating device, notification appliance circuit, battery backup, and auxiliary relay (door release, HVAC, elevator) is pre-tested prior to Fire Marshal witness inspection.

Warranty & Licensing

Workmanship warranty terms and equipment manufacturer warranties are confirmed in your written proposal; licensing and subcontracting roles are clearly defined up front.

Applicable License: California CSLB #1076251 (C-10 Electrical)

How This Scope Adapts by Industry

Hospital fire alarm modifications coordinated with HCAI oversight, ICRA barriers, and phased clinical cutovers.

Why AG Network Cabling

Single accountable contractor for C-7 low voltage and C-10 electrical.
Clean, Velcro-dressed, ANSI/TIA-606-D labeled infrastructure.
Discreet execution in occupied offices, luxury hotels, clinics, and data halls.
Direct access to accountable owners and a free on-site survey before work begins.

Related Services

Frequently Asked Questions

How does California licensing work for commercial fire alarm installations?

In California, electrical/fire alarm installation is performed under a C-10 Electrical license with CSFM-listed equipment and AHJ-approved plans. Where a project requires a dedicated fire alarm contractor or engineered stamp, we clearly define our role as prime or subcontractor during estimating.

Do you handle the tie-in between fire alarm panels and access-controlled doors?

Yes. Because AG installs both access control and C-10 electrical/fire-alarm wiring, we coordinate fail-safe maglock release relays cleanly so there is no gap between trades during Fire Marshal inspection.

Can you modify existing fire alarm devices during an office tenant improvement?

Yes. We relocate and add horn/strobes, smoke detectors, and pull stations to match revised architectural partitions and approved TI fire-alarm drawings.

Do you provide fire alarm design and plan-check submittals?

We coordinate design and plan-check submittals with qualified NICET-certified designers or licensed fire protection engineers as required by the local AHJ.

What is NFPA 4 integrated testing?

NFPA 4 governs testing the interaction between interconnected life-safety systems—such as verifying that a fire alarm trigger simultaneously releases maglocks, recalls elevators, and shuts down HVAC air handlers.

CA CSLB #1076251 · C-7 Low Voltage & C-10 Electrical

Ready to scope your project or send plans?

Upload drawings, specifications, or an Invitation to Bid, or call us to schedule a free on-site survey.